O
b
j
e
c
t
L
i
s
t
R
e
f
e
r
e
n
c
e
(Lo
w-
ri
se
 
Co
ns
tr
uc
tion)
Recognizable companies and projects we have worked with.
See the list of projects, which speak of our experience and quality.
Name of the object
City
Surface
BRIDGE : Pedestrian bridge over the Belice River - AB carriers
Jagodina
L=30.00 m
BRIDGE: AB Barriers “NEW JERSEY” for the bridge over the Sava River
Beograd
BRIDGE: AB staircase for the bridge over the Sava River
Beograd
BRIDGE: AB plates for the bridge over Topčiderka
Beograd
BRIDGE: AB barriers “NEW JERSEY” for bridge over Kiev creek
Beograd
TUNNEL: AB brackets (rigs) for TUNNEL VELIKI KIK I GOLUBAC
Gornji Milanovac
Brackets 13.75m', 14.35m
Big Kik l=200,00M'
Golubac l=125,00M'
BRIDGE: PAB supports for the bridge over the Nishava River
Pirot
Carrier 25,00 m'/ L=65 m
BRIDGE: AB supports for bridges across the canal in Grabovica
Grabovica
L=15.00 m
BRIDGE: PAB supports for the bridge over the Podvrška river near Milutinovec
Kladovo - Brza Palanka
carrier 25,00 m'/ L=75 m
BRIDGE: AB supports for the bridge over the river Jošanica
Village Yoshanitsa
L=11,50 m
BRIDGE: PAB supports for the bridge on the Kutina River
Nis
Carrier 24.75m'/ L=25 m
BRIDGE: PAB bridge supports for the bridge over the Kolubara River and the bridge over the Pestan River
Carriers 24,40m'/ L=25 m
ROAD: AB elements for lining slopes on the section of the road Ljig-Boljkovci
Ljig - Boljkovci
BRIDGE: AB supports for the bridge over the Mlava River
Kamenovo
L=8.10 m
BRIDGE: PAB Carriers Bridge No.9 over the Sava
Ostruznica - Dobanovci
Bracket 25.60m'/ L=416 m
GAS PIPELINE: AB based Serbia gas for main gas pipeline Bulgaria-Hungary border
TUNNEL: AB supports for Beli Potok tunnel, ring road around Belgrade
Ostruznica - Bubanj Potok
Carriers 15.18 m'/ L=360,10M'      
BRIDGE: AB brackets for Bridge No. 16 at km 590+981.50 of the E-70/E-75 highway (left+right side)
Dobanovci - Bubanj Potok
Carrier 25,00m'/ L= 2 x 364 = 728 m
OVERPASS: AB brackets for Overpass No. 26 at km 590+263,79 of the E-70/E-75 highway
Dobanovci - Bubanj Potok
Brackets 22,40m', 25,40m', 27,90m'/ L=195,53
OVERPASS: AB Overpass Brackets at KRAKU 10 — Bubanj Potok (Sectors 4, 5 and 6)
Ostruznica - Bubanj Potok
Nockers 34,20m';
28.20m'/ L=195 m
OVERPASSES: PAB supports for section 1 on the Danube Corridor Stationation Project:

km 13+184,023
km 14+457,007
km 16+489,855
km 17+392,885
km 3+873,993
km 19+023,005
km 21+329,534
km 20+298.94;
Pozarevac
Brackets 36,60m', 27,30m', 24,08m'

l=36,60m'
l=36,60m'
l=36,60m'
l=36,60m'
l=82,00M'
l=82,00M'
l=82,00M'
l=50,00M'
BRIDGE: PAB supports for the bridge on the Danube Corridor, Požarevac, km 1+475,15 left side
Pozarevac
Brackets 30.90m', 37.95m', 32.90m' l=259,00M'
BRIDGE: PAB supports for the bridge over the river Rasina km 6+493.00 to km 8+417.38, bypass Kruševac
Petlja Kruševac east
Carriers 18,00 m', 23,30m', 28,35m' L=160,00 m'