In our new RAJ IBELIK factory in V.Plana, our own plant was established for the preparation of reinforcement required for the production of prefabricated RC elements. This plant now has an increased processing capacity, allowing reinforcement to be bonded 20 — 35 t/day. This efficiency is supported our new increased production capacity of 350 m3 /day prefabricated RC elements.
The prepared binding reinforcement is provided by the member of our Holding, RAJ FERT, thus closing the entire production cycle in our own plants. This integration enables stable and continuous production.
Our experienced bar - fixers are specialized in the processing of reinforcement for prefabricated RC elements and contribute to the production quality of the final prefabricated elements.
The complete static calculation of the reinforcement as well as the elaboration of the workshop drawings is prepared in our Project Office in Belgrade.
This synergy of all our employees, who are top experts in their fields, guarantees us controlled and quality production.